by Client Name Here | Sustainable Decking
Elsternwick Project Look past the lack of landscaping and focus on the deck. This was one tough challenge. Curving decking is something we enjoy doing, but when it came to curving a millboard deck, that was next level. Architect designed, curves, built steps,...
by Client Name Here | Sustainable Decking
Brighton Project Out with the old, in with the new. Using H4 treated pine is the only subfloor that can be used (unless it’s aluminium) when building so close to the ground. This deck size and shape only changed slightly, the choice of board completely changed....
by Client Name Here | Sustainable Decking
Hawthorn Project Who said a small space can’t be utilised. This once concrete pad is now an inner-city oasis. BBQ, outdoor kitchen and sitting area is all that’s required for a family of 2 who wants to make the most of their private space. Millboard deck...
by Client Name Here | Sustainable Decking
Malvern East Project Curved deck anyone This was an awesome project . Constructing this 1/4 pie shaped deck was a real challenge but completely satisfying. The set out had to be millimetre perfect in order for this to work. We used a timber pendulum to create the...
by Client Name Here | Sustainable Decking
Mont Albert Project Rags to Riches What a transformation. A once old iron bark 32mm thick decking board covered this space. To say it was the hardest demo ever done, is an understatement. 20 saw blades , 30 grinding discs and 6 days later was a real test on the body....
Recent Comments