Carnegie Dreamtime

Project

Millboard’s beautiful Ashwood colour nearly perfectly matched the internal flooring, so when the massive sliding doors were rolled back,  outside and inside became one.
So much went into this build. Half the deck was constructed over concrete, half over natural ground.  The transition from the deck to pool was the tricky part, so the location of the steps was crucial without making them a feature.
The surrounding landscaping (done by Leon’s Landscaping) really brought the project together. The end results speak for itself. 

View More

Projects

Hawthorn

Due to the closed courtyard location, the previous hardwood deck struggled to allow airflow to circulate and dry out the decking boards which is critical when it comes to 'decking lifespan'. So, for this make over we replaced the entire subfloor, added joist tape to protect the frame from moisture, and used WoodEvo composite decking as the board of choice.

Berwick

The half-moon shaped deck located adjacent to the pool complements what was already a beautiful space. The single step up gave the impression of a slightly elevated platform, a perfect spot for lazing around while relaxing underneath the tropical palms.